Ampscale
Auto dealership service area with EV charging project needs
Dealer charger readiness

Can this store take OEM chargers?

Know which rooftops can add Level 2 or DC fast chargers before the quote turns into a service-upgrade surprise.

Store-by-store answer
OEM charger plan tested
Reviewer packet ready
Headroom range
Missing proof
Permit path
Plain answer

Which stores can install chargers without overbuilding?

Ampscale checks existing peak, service clues, panel photos, charger load, and missing proof so the store knows whether to proceed, cap, verify, or escalate.

OEM Level 2DC fast chargerService equipmentBody shop load
Auto dealersHeadroom Passport
Which stores can install chargers without overbuilding?
Sample pathAdd with evidence
ConfidenceMedium
  • Bill or interval data checked
  • Photos or drawings improve confidence
  • Permit path and next owner shown
Evidence ladder

Start with what you have.

Each added proof point tightens the range and makes the package easier to review.

Bills and demand history

See how much of the service is already used.

Panel and switchgear photos

Verify the rating clues that matter before drawings begin.

Charger cut sheets

Treat continuous load correctly and compare capped versus uncapped charging.

Decision paths

Know the next move before money is stuck.

Path 1

Install path

Enough headroom appears likely for the planned chargers.

Path 2

Managed charging path

A cap can make the project practical while preserving reviewer confidence.

Path 3

Upgrade risk

The site needs stronger evidence, utility input, or service planning.